Finishing works at Hiyaa 7000 flats

2021 · Hiyaa 7000 · Hulhumalé

150 flats in 8 months
Finishing works at Hiyaa 7000 flats — Hiyaa 7000, 2021

We completed finishing works at Hiyaa 7000 Flats covering tiling, painting, fabrication and installation of doors, and custom furniture. 150 flats were delivered in eight months.

Other projects

2023 · MPL Hiyaa · Hulhumalé

Custom made furniture for MPL Hiyaa flats

We designed and crafted bespoke furniture for MPL Hiyaa Flats in Hulhumalé, tailoring each piece to complement the living spaces…

View project

2022 · The CrossRoads Maldives

Diesel tank maintenance

At The CrossRoads Maldives we maintained two 200,000 litre diesel tanks, addressing severe rust and corrosion through sandblasting and protective…

View project

2026 · Maldives National Defence Force · Addu

Aircraft hangar floor coating

The existing hangar slab was cracked, stained and contaminated across the full bay. The floor was prepared, joints and cracks…

View project