2023 · Holiday Inn Kandooma Resort
Fabrication of a 15,000 litre petrol tank
We fabricated and installed a 15,000 litre petrol tank at Holiday Inn Kandooma, replacing the existing one. The project covered…
View project
Construction · Coatings · Tank solutions · Maldives
Nexro fabricates, maintains and protects storage tanks and delivers construction, painting and carpentry works for resorts, government and commercial clients across the Maldives.
About Nexro
Nexro Pvt Ltd provides construction, painting and tank solutions to residential and commercial clients throughout the Maldives. Our work is organised into three divisions — construction, paint and finishes, and tank solutions — so one team can carry a project from planning and procurement through to handover.
We work to written scopes, agreed timelines and transparent payment terms, and we back our workmanship with a warranty.
What we do
Every division is staffed by its own tradesmen and run under a single project manager.
We design and install reliable, efficient storage tanks for diesel, petrol and water, sized and specified for the site.
High-pressure abrasive blasting strips rust, old paint and contaminants back to clean steel so coatings bond properly.
Coatings designed for tank storage, protecting the steel from corrosion and protecting what is stored inside it.
Planned maintenance and prompt repair for structural issues, leaks and damage, to keep a tank in service.
Transforming existing residential and commercial spaces, from single rooms to whole buildings.
Painting for residential, commercial and resort properties, including high-rise exterior work.
Tank solutions
We design, fabricate, install, maintain and repair diesel, petrol and water storage tanks. Sandblasting strips rust and contaminants back to clean steel so coatings bond properly and the tank lasts.
Interactive
Drag to rotate the tank and tap a marker to see what each stage of the work involves.
Drag to rotate · tap a marker
Condition
Corrosion, scale and failed coating. This is how most tanks look when we are first called out.
Stripped back to clean bare steel. How well this stage is done decides how long the finished coating lasts.
Primer and top coats applied, specified for the substance stored. Coating performance is covered by our warranty.
Tanks are fabricated for diesel, petrol and water storage to the approved design and specification — steel sheets, reinforcement bars, welds, seams and joints — to industry standards for durability and structural integrity.
High-pressure air and abrasive media strip rust, old paint and surface contaminants back to clean steel. This is what lets the coating adhere properly and is the single biggest factor in how long the tank lasts.
Coatings designed for tank storage are applied to protect against corrosion, weathering and environmental exposure, and to protect the substance stored inside.
Structural issues, leaks and damage are addressed in place, restoring the integrity of the tank so it can be returned to service.
Testing identifies leaks and inaccuracies in the tank system, and calibration confirms that the tank measurements you are reading are the volumes you actually hold.
Regular inspection, cleaning and upkeep keep a tank in service and keep the workmanship warranty valid. We also carry out cleaning and disinfection for water and fuel quality.
22+
Documented projects
6
Resort and hospitality clients
3
Operating divisions
2yr
Maximum workmanship warranty
Who we work for
Selected work
A sample of completed works. Full references are available on request.
2023 · Holiday Inn Kandooma Resort
We fabricated and installed a 15,000 litre petrol tank at Holiday Inn Kandooma, replacing the existing one. The project covered…
View project2023 · JA Manafaru
At JA Manafaru we carried out maintenance on three 170,000 litre water storage tanks. The work involved removing rust and…
View project2023 · MPL Hiyaa · Hulhumalé
We designed and crafted bespoke furniture for MPL Hiyaa Flats in Hulhumalé, tailoring each piece to complement the living spaces…
View project2022 · The CrossRoads Maldives
At The CrossRoads Maldives we maintained two 200,000 litre diesel tanks, addressing severe rust and corrosion through sandblasting and protective…
View project2022 · Four Seasons Kuda Huraa
We replaced thatch roofing for 28 villas and the lobby at Four Seasons Kuda Huraa, preserving the tropical aesthetic. Sourcing…
View project2022 · Four Seasons Kuda Huraa
The Four Seasons Kuda Huraa villa renovation project revitalised 96 villas through floor treatments, painting and pool cleaning, delivered within…
View projectWhere we have worked
Select an atoll to see the work completed there. We mobilise with our own crews, tools and materials.
Schematic. Atoll positions are indicative, not to scale.
25 projects across 4 atolls
Select a marker to see the projects on that atoll.
21 projects
Why Nexro
A written scope of work covering exactly what is included, before anything starts.
Project milestones agreed up front and efficient scheduling to minimise disruption to your operation.
Payment terms and methods set out plainly, with no surprises at invoice stage.
One to two years on the services we provide, covering materials, workmanship, leaks, structural integrity and coating performance.
Planning, design, procurement, construction and finishing handled as one accountable scope.
Regular safety training, correct PPE, hazard identification and controlled handling on every site.
Where we work
We mobilise to island sites with our own crews, tools and materials, and plan around resort operating calendars so works land in the least disruptive window.
Send drawings, tank capacities or a short description of the scope and we will come back with a written quotation.